On 18MAR06 the C-MAN station at Molasses Reef was overhauled by NDBC and SEAKEYS. All MET sensors were checked/replaced and a new payload was installed. Seakeys sensor fully functional.
In Situ CT 17:00 25.25C 36.84psu
GT 17:00 25.36C 36.21psu
Complete installation plans are on track for DRYF1 and SANF1 by 1JUN06.