Wednesday, March 21, 2007

LONF1 cleaning

LONF1 was serviced 3/20/2007

14:00 ET GT: 22.47C, 37.43psu In Situ: 22.44C, 36.47psu
15:00 ET GT: 22.68C, 36.99psu In Situ: 22.67C, 36.69psu

In addition to standard cleaning, the entire station was washed down to remove guano in excess of 100 pounds for over 2.5 hours. There may be a need to replace 2 pull box faces.

We are also aware of the situation at MLRF1 and will address as soon as weather permits.