Monday, May 01, 2006

SEAKEYS Station Maintenance

On 4/27 SMKF1 was cleaned.

11:00 ET b. cl. GT: 27.53C 36.48psu In Situ: 27.45C 36.07psu
12:00 ET a. cl. GT: 27.72C 36.51psu In Situ: 27.63C 36.62psu

On 5/1 LONF1 was exchanged.

13:00 ET b. ex. GT: 24.47C 38.39psu In Situ: 24.48C 36.71psu
14:00 ET a. ex. GT: 24.91C 38.07psu In Situ: 24.80C 38.05psu

DRYF1 will be installed the week of May 15th
SANF1 will be installed the week of May 22nd
I will try to get a blog out following each installation, but logistics may prevent any communication until after both stations are up an running.